Water damanged Washburn D22E_0022_16

Removing the finish revealed just how bad the damage to the bridge area was. This pre-dates our removal of the bridge and appears to be what the previous repair was attempting to cover up. Either way it does not provide a suitable gluing surface for the bridge, so some patch-work is required