5 Published September 8, 2015 at 900 × 600 in Maton EM225C Acoustic – brace and bridge repair. ← Previous Next → All of the lacquer was also removed to allow for a fresh finish. Bridge pin holes were also chamfered for proper set-up The bridge was then taped off and given several very thin coats of satin lacquer – just as Maton treat their bridges.